Absorption-tower safeguards.
ABOUT / PROCESS
Manufacturing clarity builds packaging confidence
A controlled, traceable route from raw material to finished fluorinated packaging.
[测试内容,后期替换]We focus on high-barrier fluorinated plastic packaging and technical services, serving industrial customers with stable processes, rigorous inspection and traceable manufacturing.[测试内容,后期替换]
Calipers, gauges and safety valves.
Finished goods stored at the production site.
Qualification images will be published soon.
PRODUCTION ROUTE
Plastic bottle manufacturing process
No outsourced processing. Core steps remain under direct quality control.
- 01Raw materialsHDPE 5502 / 5401 · Masterbatch
- 02Mixing and meltingControlled masterbatch ratio
- 03Blow moldingStable molding parameters
- 04Mixed-gas preparationFluorine absorption tower protection
- 05Controlled fluorinationSealed process control
- 06Nitrogen washingResidual gas removal
- 07TrimmingOffcuts and rejects separated
- 08Inspection, packing and storageQualified products warehoused
80%
Finished-product yield per ton of raw material
20%Offcuts and rejects sent for compliant disposal
FACILITY
People, equipment and storage
Shift operation
Two shifts with 12 people per shift.
Warehouse
One warehouse at the production site.
Equipment
Forklift, pressure vessel and required measuring equipment.